<strong id="1kc0g"></strong>
<style id="1kc0g"><pre id="1kc0g"><table id="1kc0g"></table></pre></style>
<option id="1kc0g"></option>
<strong id="1kc0g"><ruby id="1kc0g"></ruby></strong>

    <form id="1kc0g"><pre id="1kc0g"></pre></form>
    
  1. <del id="1kc0g"><center id="1kc0g"><sup id="1kc0g"></sup></center></del>
    Communication Engineering
    Hainan Launched the third 750kV line project from Xining to Hele to Tala

    1632451785867958.jpg1632451799123873.jpg

    The total length of the tala-Qingnan-Xining three-way power transmission project is 455.39 kilometers, with a total of 1020 tower bases. The interval between Xining and Tala substations will be expanded. Among them, Qingning Line ⅰ and Qingta Line ⅰ were put into operation first in June 2020, which was also the first time for uHV Qingnan converter station to access power. Subsequently, Qingning line ⅲ and Qingta Line ⅱ were put into operation.

    It has laid the foundation for green electricity transmission of qingyu DC project.


    電 話
    產 品
    短 信
    聯 系
    精品无码国产AV综合,亚洲视频之中文字幕,久久99久久这里只有精品,精品一线天av无码

    <strong id="1kc0g"></strong>
    <style id="1kc0g"><pre id="1kc0g"><table id="1kc0g"></table></pre></style>
    <option id="1kc0g"></option>
    <strong id="1kc0g"><ruby id="1kc0g"></ruby></strong>

      <form id="1kc0g"><pre id="1kc0g"></pre></form>
      
      • <del id="1kc0g"><center id="1kc0g"><sup id="1kc0g"></sup></center></del>